SOPs
Installation Documentation Procedure
Capture as-built evidence per device, in the same format every time, so the documentation package never depends on which technician wrote it.
- Performed by
- Lead Technician
- Used in processes
- Governing standards
Procedure
- 1For each installed device, log its serial number or identifier.
- 2Photograph each device in its final installed state.
- 3Record wiring or configuration notes for anything not visible in a photo.
- 4Verify every change from original scope references an approved Change Order.
- 5Assemble the package and name files per the File Naming Standard.
- 6Sign off.
Decision / troubleshooting points
- Does any device lack complete evidence? → Return to the specific device, not a full re-walk of the site.
Required evidence
- Device identifier per unit
- Photo per unit
- Wiring/configuration notes where applicable
- Change Order references where applicable
- Completion criteria
- Every installed device has a logged identifier and photo, and the Lead Technician has signed off.
- Escalation
When: A change was made in the field with no linked Change Order.
Involve: Project Manager
Future system assistance
- Require a photo before a device can be marked documented.
- Auto-check filenames against the File Naming Standard.
- Block sign-off until every device has evidence.