Technical / Field Services
Installation Execution & Commissioning
Do the physical and technical work, and verify it actually functions before calling it done.
- Trigger
- Project mobilized (READY_FOR_INSTALLATION).
- Owner
- Lead Technician
- Participants
- Inputs
- Crew roster and equipment.
- Project plan.
- Required conditions
- Site access.
- Safety readiness.
Steps
- Assign daily tasks to Field Technicians.
- Execute installation, wiring, and configuration.
- Test and commission the installed systems.
- Lead Technician verifies against scope.
Decision points
- Does testing/commissioning pass? → If not, troubleshoot and retest before proceeding to Documentation.
- Outputs
- Installed and tested systems.
- Failure / exception path
- Commissioning fails — logged as an open technical issue, not silently reworked without a record.
Related system objects
Related lifecycle stages
Related standards
Related forms
None yet
Future automation opportunity
None specific to the labor itself — automation applies more to the surrounding paperwork (EOD, documentation) than to physical installation.
Required data
- Task assignment and completion date
- Commissioning test result
- Retest count