Testing / Commissioning Procedure
Verify installed systems actually work before calling installation complete — the gate between "installed" and "done."
- Performed by
- Lead Technician
- Used in processes
- Governing standards
Procedure
- 1Power on and initialize the installed system.
- 2Run the standard test sequence for the system type.
- 3Verify integration with any connected systems.
- 4Record the test result.
- 5Retest after any fix before proceeding.
Decision / troubleshooting points
- Does the system pass every test? → If not, troubleshoot and retest; log the issue either way.
Required evidence
- Test result per system
- Retest count, if applicable
- Completion criteria
- Every installed system shows a passing test result.
- Escalation
When: A system fails testing and the cause isn't resolvable on-site same-day.
Involve: Project Manager
Future system assistance
- Structured pass/fail capture per system type.
- Prompt for retest logging.