SOPs
Site Survey Procedure
Make every site survey capture the same minimum information, regardless of who performs it, so the Estimate that follows is never guessing.
- Performed by
- Estimator
- Used in processes
- Governing standards
Procedure
- 1Confirm arrival and introduce yourself to the site contact.
- 2Walk the site following the Site Survey Standard checklist.
- 3Photograph every area relevant to scope.
- 4Record measurements relevant to scope.
- 5Note existing infrastructure or systems relevant to the new scope.
- 6Note any access constraints discovered.
Decision / troubleshooting points
- Is anything in the requested scope physically infeasible as described? → Note it now — don't wait for Estimate to discover it.
Safety / caution
- Do not open electrical panels or access restricted areas without the site contact present.
Required evidence
- Photos covering all scope-relevant areas
- Completed measurement set
- Completed checklist
- Completion criteria
- The Site Survey Standard checklist shows 100% complete and is attached to the opportunity.
- Escalation
When: Site access cannot be arranged, or the scope is not physically feasible as sold.
Involve: Sales Director
Future system assistance
- Prefill site address and customer info from the opportunity record.
- Require every checklist item before allowing survey submission.
- Prompt for a photo per checklist category.