Testing & Commissioning — IET-2026-0043
Whether the installed systems actually meet their Acceptance Criteria — the gate between "installed" and "done."
Live workspace — changes save to the shared IETEL OS database through the real, authorized API, visible to everyone assigned to this project. You need to be signed in as the Position this step requires; the server decides that, never this page.
Source Baseline
Acceptance Criteria inherited from the Approved Design Snapshot — not re-entered here.
Inherited- Approved Design Snapshot
- IET-ASMT-2026-001-DESIGN-SNAP-1
- Acceptance Criteria tested
- 3
Testing & Commissioning
Source: installation-execution-commissioning Process & Testing/Commissioning Standard — every applicable criterion must pass, or be excepted where eligible; a project is never called done with an unresolved failure.
Derived