Estimate — IET-ASMT-2026-001
What it will cost IETEL to deliver the validated design, what IETEL should charge, and what assumptions govern that price — consuming Solution Design without re-asking any of it.
Prototype UI — nothing you change here is saved. Reloading the page resets it to the sample data.
Design Inputs
Inherited from the validated Solution Design — read-only, never re-entered here.
Inherited- Design status
- READY WITH DOCUMENTED EXCEPTIONS
- Architecture summary
- Cloud-managed access control platform replacing shared brass keys at both openings. Credentials issued and revoked centrally; every event logged with identity and timestamp.
- System components
- 3
- Openings / locations
- 2
- Power
- dedicated-supervised — Warehouse side needs a new dedicated circuit, pending panel location confirmation. Main entrance can use the existing confirmed outlet.
- Network
- cloud-connected — Requires customer IT coordination to confirm switch port and firewall rules for cloud connectivity.
- Cybersecurity
- shared — IETEL manages platform and firmware; customer manages the user roster and credential issuance.
- Acceptance criteria
- 3
- Documented exceptions
- 1
Design assumptions / exclusions
- Assumes the existing conduit pathway between the IT closet and main entrance is reusable.
- Excludes replacement of the legacy CCTV system — out of scope for this phase.
Customer responsibilities / Third-party responsibilities
- Confirm employee roster source for credential issuance.
- Provide a static IP or DHCP reservation for the access control panel.
- Local fire marshal review for the warehouse door hardware change.
- Fire marshal sign-off required before finalizing warehouse door hardware.
Estimate Items
One or more items per design component — not a forced 1:1. A component may become a material line, a labor line, both, or neither, if it turns out to be someone else's scope.
Cost & Margin Summary
Every figure below is computed — none of it is a field you type directly.
Estimate Revisions
A Revision is a frozen commercial snapshot — created once, never edited afterward. Only an Approved Revision can become a Proposal; the working draft above never can, no matter how complete it looks.
Assumptions, Exclusions & Validity
Design assumptions/exclusions are inherited, not repeated — Estimate adds only commercial-specific items.
Inherited from Solution Design
Inherited- Assumes the existing conduit pathway between the IT closet and main entrance is reusable.
- Excludes replacement of the legacy CCTV system — out of scope for this phase.
Estimate-specific commercial assumptions / exclusions
Proposal Handoff Preview
A live preview of what Proposal would receive if you created and approved a Revision right now — customer-facing commercial truth only. Internal cost, unit costs, subcontractor cost, and margin are never passed to this preview.
This reflects your current unsaved working draft, not an approved commercial baseline. The actual Proposal document is generated only from an Approved Estimate Revision — see Estimate Revisions below.
This preview is generated from customer-facing fields only — it has no code path to cost, unit cost, or margin data.